To date we have all the windows installed as well as the doors on the front, back and basement of the cabin.
We have a Door!
With the decking installed and temporary felt on the roof, the cabin is dry. Can't wait till we get the metal on the roof (which has just started). We'll send you pictures of the metal next blog.
The Front of our Cabin
We have the stain on the front and on the south side of our cabin.
Caulked and two coats of Stain
Our Log Stairs
We've just finished the log stairs that you will see as you enter the from door of the cabin. The rails and spindles are yet to come.We have most of the interior framing finished and our fireplace installed.
Interior framing and fireplace
We'll send you pictures of more of the interior as we make progress on these.
Thanks for being a part as you follow our build!