Saturday, August 2, 2014


We love seeing the wildlife at Flint Ridge. 

We also Love seeing these "approval" stickers from the local inspector!

Plumbing is ready for the slab to be poured

Slab is poured.

Time to frame the two basement daylight walls, install the joists and first floor subfloor, because our first truck of logs arrive Monday!  Yea!


2 comments:

  1. This really makes me smile!!

    ReplyDelete
    Replies
    1. Thanks Donna, you guys have always been a big part of this!

      Delete